Last edited by Voodoosho
Sunday, October 4, 2020 | History

1 edition of Comparative cost-effectiveness analyses at a Naval Air Rework Facility found in the catalog.

Comparative cost-effectiveness analyses at a Naval Air Rework Facility

by John Richard McGarrahan

  • 122 Want to read
  • 22 Currently reading

Published by Naval Postgraduate School in Monterey, California .
Written in English


ID Numbers
Open LibraryOL25388227M

As the Director of the Naval Center for Cost Analysis (NCCA), Mr. Schluckebier advises the Department of the Navy (DON) leadership on cost issues. He oversees a staff of cost analysts to develop defensible independent government cost estimates, provide cost analysis . for Commander, Naval Surface Force, U.S. Pacific Fleet (COMNAVSURFPAC) and Commander, Naval Surface Force Atlantic (COMNAVSURFLANT) ships regarding Air Certification per references (a) through (u). 2. Cancellation. COMNAVSURFORINST B, CH 3. Revision. Changes to the cancelled instruction are extensive.

Bibliography: l. Addeddate Call number ocn Camera Canon EOS 5D Mark II.   Program evaluations of ongoing facility activities and proposed plans. It is important to point out economic analyses and program evaluations serve very different purposes. Economic analyses are “pre-expenditure” analyses designed to assist a decision-maker in identifying the best new projects or programs to adopt.

2 † To create a process that links force structure to infrastructure sites. † To be a stand-alone assessment tool to aid in programming investment through analysis of future quality impact to inven-tory and shore readiness. † To include a macro year, long-range forecasting tool. First, we analyzed the Navy infrastructure to determine the nature. A valuable resource for scholars and practitioners, novices and experts alike, this book offers a comprehensive overview of Military Cost-Benefit Analysis (CBA).


Share this book
You might also like
gold dog

gold dog

guide to the scrolls

guide to the scrolls

Beginning Racquetball

Beginning Racquetball

Actuarial costs for retired teachers returning to work in critical shortage areas

Actuarial costs for retired teachers returning to work in critical shortage areas

High-level robot programming in dynamic and incompletely known environments.

High-level robot programming in dynamic and incompletely known environments.

Genetic drift in repeated games played by finite automata

Genetic drift in repeated games played by finite automata

Magic Carpet.

Magic Carpet.

development of techniques for maintaining teeth in vitro, and the use of these techniques with special reference to problems concerning transplantation of teeth.

development of techniques for maintaining teeth in vitro, and the use of these techniques with special reference to problems concerning transplantation of teeth.

Phillips family of Old Somerset County, Province of Maryland, 1672-1984

Phillips family of Old Somerset County, Province of Maryland, 1672-1984

Oxford annotated Bible with the Apocrypha

Oxford annotated Bible with the Apocrypha

False impersonation of officers of Government-owned corporations.

False impersonation of officers of Government-owned corporations.

Subsistence expenses for civilian officers and employees.

Subsistence expenses for civilian officers and employees.

history of St. Boniface College

history of St. Boniface College

retreat from authority.

retreat from authority.

Oklahoma educational status study

Oklahoma educational status study

Comparative cost-effectiveness analyses at a Naval Air Rework Facility by John Richard McGarrahan Download PDF EPUB FB2

ComparativeCost-EffectivenessAnalyses ataNavalAirReworkFacility by ahan Captain,UnitedStatesArmy B.S.,WheatonCollege(Illinois), Comparative cost-effectiveness analyses at a Naval Air Rework Facility. By John Richard McGarrahan. Download PDF (7 MB) Abstract. Approved for public release; distribution is unlimitedThe objective of this study was to compare alternative approaches to the cost-effectiveness analysis of a technological change at the Naval Air Rework Facility Author: John Richard McGarrahan.

A number of factors in this problem are different from the usual cost-effectiveness problem, some aircraft being procured today will still be in use, Naval aircraft have multiple mission capability (both strategic and tactical), the ships being built now or already commissioned are those from which next generation aircraft will operate and Cited by: 4.

Institute of Naval Studies, University of Rochester. This paper is a revision of INS RC 23, “Interim Report on the Assignment of Aircraft to the Naval Advanced Jet Pilot Training Mission” conducted under contract N–14–68–A– at the Institute of Naval Studies, Center for Naval Analyses of the University of Rochester and dated November Cited by: 6.

A Naval Reserve Aviation Base commissioned the property on 15 Septemberand served to train pilots for World War II duty. By 1 Januarythe Naval Reserve Aviation Base was officially designated the Naval Air Station Memphis, and incorporated the current area north of Navy Road.

Because of the BRAC, Naval Air Station Memphis was. DoD Cost Analysis Guidance - and Procedures (Reference (a)), which explains the character and purpose of each of these estimates and analyses. DoD M also provides the policies, procedures, and timelines for the preparation of the various cost estimates and analyses.

OVERVIEW. The remainder of this guide is organized as follows. SEA 05C (formerly SEA ) has been designated as the technical authority for cost engineering at NAVSEA.

The NAVSEA Cost Estimating Handbook has been developed to provide a foundation of current, relevant and quality technical standards. The handbook provides information on cost engineering processes for the NAVSEA cost engineering community, as well as providing a ready reference to.

Patterson Ave. SE, SuiteWashington Navy Yard, D.C. Members of the Naval Aviation Enterprise are encouraged to use this Guide as a ready reference, and to make constructive comments for continual improvement to AIR, NAVAIR Acquisition Guide managing editor.

Acquisition Training A. NOTE: All of these records are unclassified or have been declassified. March is the last monthly issue. The Allowances publication switched to quarterly. September is the last of the quarterly issues. The Allowances publication swtiched to bi-annual.

This policy and procedures manual represents Naval Facilities Engineering Command (NAVFAC) specific criteria, requirements and procedures related to the development and delivery of Cost Engineering Services. This interim policy is provided from FY 17 through FY The cost software transition.

NAVSEA 05C, which is part of the Naval Systems Engineering Directorate (SEA 05), provides cost engineering and industrial analysis support to the Naval Sea Systems Command.

The NAVSEA 05C organizational staff includes 60 highly professional and motivated engineers, operations research analysts and other technical professionals and administrative staff. FAR(a), and ). The intransit insurance expense related to material is the cost of insurance for inbound material.

Set-Off Defences in International Commercial Arbitration A Comparative Analysis by codis by codis. by the Naval Air Rework Facilities during fiscal years The type of work done at all six rework facilities is similar, although generally, no two facilities work on the same aircraft systems, engines, or aeronautical components.

Each rework facility does work in the following nine shop categories, but a facility may use one shop more. NAVAIRMANAGEMENT MANUAL: GUIDELINES FOR THE NAVAL AVIATION RELIABILITY-CENTERED MAINTENANCE (RCM) PROCESS (01 JUL )., This manual describes the process used to develop all PM requirements for NAVAIR aircraft, engines, aircrew escape systems, weapon systems, aircraft launch and recovery equipment, and support equipment.

from book Environmental Security in Harbors and Coastal Areas: Comparative risk analysis has been most commonly applied. () use models and cost-effectiveness analysis to find an.

these accounts in order to improve and sustain Naval Aviation readiness at the required levels. Insufficient or inconsistent funding in one account can impact the ability to execute other accounts.

“As director, Air Warfare (N98), I basically run the ‘check-book’ for Naval Aviation, and my staff and I. The Department of Defense (DoD) submitted the Navy’s shipbuilding plan to the Congress in March The average annual cost of carrying out that plan, which covers fiscal years towould be $ billion in dollars, the Congressional Budget Office estimates.

Naval Aviation is an essential element of national strategy, and it must combine the right warfighting capabilities with the necessary readiness to bring those capabilities to bear.

The NAE serves as the single framework for facilitating collaboration, transparency, cross-functional engagement, information sharing and process improvements that. This study covered the aircraft rework, overhaul and remanufacture processes at the six Naval Air Rework Facilities (NAVAIREWORKFACs) and identified those processes which were most costly in the performance of organic naval air depot level maintenance.

Concerned with the logistical aspects of Naval Weapons Systems and the need to increase productivity within the Naval Air Industrial. Naval Center for Cost Analysis (NCCA) Inflation Calculator Update Instructions I. Background A. Mission This inflation tool supports NCCA’s mission to support and guide Navy cost analysis.

It supports preparation of cost estimates, budget estimates, analysis of alternatives, economic analysis, and preparation of Selected Acquisition Reports.The Operation and Maintenance, Navy (O&M,N) appropriation finances the day-to-day costs of operating naval forces, including fuel, supplies, and maintenance of ships, Navy and Marine Corps aircraft, related weapon systems, and the support establishment ashore.